Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them

Authors

  • KHWAJA ESHAQ SEDIQI Author
  • MOHAMMAD NAJIM WAHEDY Author

DOI:

https://doi.org/10.68924/ntnqva71

Keywords:

Construction Projects, Key Risks, Risk Management, Volunteering

Abstract

This research emphasizes the reduction and management of risks arising from the bidding stage of construction projects, and its purpose is to identify the risks of the bidding stage of construction projects, analyze them, and finally find suitable ways to reduce and manage them. Managing the risks of the bidding stage is very important in all construction projects, but in this research, more emphasis is placed on public construction projects. Since the tendering stage in construction projects is a prelude to other subsequent stages, so in case of negligence in this stage, failure to identify the relevant risks and failure to manage them can cause challenges in the project and eventually the failure of the project.

The method used in this research consists of studying books, scientific articles, internet sites, and also conducting a case study that was conducted in the Ministry of Public Health of Afghanistan, and finally, after identifying the risks, a comparison between the risks received from Through studies and the risks obtained through the case study.

At the end of this research, results have been obtained, through which we can reduce and manage the risks of the bidding stage of construction projects. These results are very useful for the proper progress of the projects, and it is suggested that they be used in the tender stage of the projects in the future.

At the end of this scientific article, good results have been obtained through which we can control and manage the risks of the bidding stage of construction projects. The result of this scientific article was the identification of (17) key risk types, which are summarized below:

1- Uncertainty in estimates. 2- Lack of study of previous projects. 3- Bidding on Wrong Projects. 4- Incomplete bid forms and documents. 5- Failing to visit the site. 6- Lack of complete information about the project. 7- Not evaluating equipment needs. 8- Not qualifying subcontractors. 9- Labor implications. 10- Lack of accurate information about wage rates. 11- Misunderstanding Material Requirements. 12- Rushed bids. 13- Overlooking risks. 14- Unhealthy competitions. 15- Inaccurate takeoff. 16- Scope creep. 17- Not enough time to announce an invitation to bidding.

Author Biographies

  • KHWAJA ESHAQ SEDIQI

    Khwaja Eshaq Sediqi received his B.Sc. degree in Civil Engineering from Alberoni University in 2018 and getting his M.Sc. degree in Construction Engineering Management from Kabul Polytechnic University, Kabul, Afghanistan in 2023. Started work with the Ministry of Defense in 2019 and have continued. His research interest is Construction Engineering Management.

  • MOHAMMAD NAJIM WAHEDY

    Mohammad Najim Wahedy received the B.Sc. & M.Sc. degrees in Civil and industrial construction from Kabul Polytechnic University in 2009 and 2015. He has a Ph. D. degree in Construction and Engineering Management from Semnan University. Presently, he is working as an assistant Professor at the Department of Construction & Engineering Management, Kabul Polytechnic University, Kabul, Afghanistan. His areas of research include Construction Management, Sustainability, concrete technology, and Construction technology.

Published

2026-08-22

Issue

Section

Articles

How to Cite

Investigating the Key Risks in the Bidding Stage of Construction Projects in Afghanistan and How to Manage Them. (2026). Kabul Polytechnic University International Journal of Engineering & Technology, 5(2), 77-94. https://doi.org/10.68924/ntnqva71

Most read articles by the same author(s)

Similar Articles

31-40 of 66

You may also start an advanced similarity search for this article.