Construction Productivity Analysis, Using Work Sampling Technique, a Case Study in Afghanistan

Authors

  • ABADURAHMAN NASER Author
  • INAMULLAH INAM Author
  • MOHAMMAD KHALID NASIRY Author

DOI:

https://doi.org/10.68924/ssjrz114

Keywords:

Construction Productivity, Productivity Analysis, Work Sampling

Abstract

In the construction industry, productivity is one of the most important key performance indicators and fundamental to project success. Productivity isn't everything, but it is pretty much everything in the long run. Improving construction productivity is therefore one of the priorities of the construction industry in many countries around the world. Productivity cannot be managed or improved without being measured, so it must first be measured and analyzed, and then productivity weaknesses identified and corrected. This paper aims to measure labor productivity in the construction industry and assess the percentage distribution of productive, semi-productive, and non-productive activities by observing construction work. The work sampling method was used to find out how labors spend their time during an eight-hours working day, and to identify percentage of the productive, semi-productive and nonproductive tasks on a working day. The required number of the observations was calculated, the procedure for making observations was determined, and data were collected through observations made on a construction project as a case study. based on this study, it is found that generally about 32.02% of laborers’ working time is spent on productive (direct) work, 36.70% on semi-productive (supportive) work, and 31.28% was spent on nonproductive (delayed) work.

Author Biographies

  • ABADURAHMAN NASER

    Abadurahman Naser received the BSc. degree in Civil Engineering from Nangarhar University in 2013 and completed MSc Civil Engineering (Project Management) in 2019, from Istanbul Kultur University, Istanbul City, Turkey. Currently, He is working as teaching assistant in the Department of Civil Engineering, Laghman University, Mehtarlam, Afghanistan. His areas of research include building construction materials and construction management.

  • INAMULLAH INAM

    Inamullah Inam received the BSc. degree in Civil Engineering from Nangarhar University in 2012 and in 2016, he completed his MSc. degree in Civil and Structural Engineering from Kyushu University in Japan. Currently, He is working as teaching assistant in the Department of Civil Engineering, Laghman University, Mehtarlam, Afghanistan. His areas of research include durability of concrete materials.

  • MOHAMMAD KHALID NASIRY

    Mohammad Khalid Nasiry received the BSc. degree in Civil Engineering from Nangarhar University in 2013 and he received the M.Tech Civil Engineering (Hydraulic structures) 2020, from Z.H college of Engineering and Technology, Aligharh Muslim University in India. Currently, He is working as teaching assistant in the Department of Civil Engineering, Laghman University, Mehtarlam, Afghanistan. His areas of research include concrete and hydraulic concrete structures design.

Downloads

Published

2026-08-22

Issue

Section

Articles

How to Cite

Construction Productivity Analysis, Using Work Sampling Technique, a Case Study in Afghanistan. (2026). Kabul Polytechnic University International Journal of Engineering & Technology, 3(1), 1-14. https://doi.org/10.68924/ssjrz114

Similar Articles

51-60 of 92

You may also start an advanced similarity search for this article.