Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan

Authors

  • NOORULHAQ QAITMAS Author
  • MOHAMMAD NAJIM WAHEDY Author

DOI:

https://doi.org/10.68924/b385x925

Keywords:

Afghanistan, Communication, Construction Engineering, Project Management

Abstract

Effective communication management is crucial for the success of construction projects in Kabul, Afghanistan. However, there are significant challenges that hinder the attainment of effective communication practices in this context. This academic article aims to investigate the factors contributing to the lack of effective communication management in the implementation of construction projects in Kabul Afghanistan. The study utilizes a mixed-methods approach, combining questionnaire surveys with key stakeholders to gather data on communication needs, current practices, and challenges faced. Through data analysis, the article identifies key factors such as fragmented communication channels, unpromising trainings and resources for improving communication, cultural differences, not identifying the key stakeholders, to unutilized communication networks and tools for efficient information exchange, unpromising transparency and accountability, information overload, and language barriers that impede effective communication management. Drawing upon the findings, the article provides recommendations and strategies to enhance communication management in construction projects, including the establishment of effective communication channels between stakeholders’ establishment of clear protocols, Providing comprehensive training and resources, fostering a culture of open communication, addressing cultural and linguistic factors, Utilize feedback mechanisms,  and leveraging technology. By addressing these factors, construction projects in Kabul Afghanistan can overcome communication challenges, improve coordination and collaboration, and ultimately achieve successful project outcomes. This article contributes to the existing literature by providing insights into the specific challenges faced in communication management in Kabul Afghanistan, and offering practical solutions for enhancing communication effectiveness in construction projects.

Author Biographies

  • NOORULHAQ QAITMAS

    Noorulhaq Qaitmas received his B.Sc. degree in Civil Engineering from Faryab University in 2019 and his M.Sc. degree in Construction Engineering Management from Kabul Polytechnic University, Kabul, Afghanistan in 2023. Started work with the Ministry of Energy and Water in 2021 for two years, and now he is working in the Ministry of Urban Development and Housing also he worked for two years as the honorary deputy of the Social Welfare Organization for Women and Children (SWOWC) in the implementation of development and humanitarian projects. His research interest is Construction Engineering Management.

  • MOHAMMAD NAJIM WAHEDY

    Mohammad Najim Wahedy received the B.Sc. & M.Sc. degrees in Civil and industrial construction from Kabul Polytechnic University in 2009 and 2015. He has PhD degree in Construction and Engineering Management from Semnan University. Presently, he is working as an assistant. Professor at Department of Construction & Engineering Management, Kabul Polytechnic University, Kabul Afghanistan. His areas of research include Construction Management, Sustainability, concrete technology, and Construction technology.

Downloads

Published

2026-08-22

Issue

Section

Articles

How to Cite

Investigating the Lack of Effective Communication Management Factors in the Implementation of Construction Projects in Kabul Afghanistan. (2026). Kabul Polytechnic University International Journal of Engineering & Technology, 4(1), 135-156. https://doi.org/10.68924/b385x925

Most read articles by the same author(s)

Similar Articles

31-40 of 106

You may also start an advanced similarity search for this article.